SH1 looking north from the Gillies Ave On and Off-ramps .
|
|
|
Khyber Pass Viaduct and SH1 looking southbound.
|
|
|
Grafton Bridge 3a widening works showing half of the beams for the widening installed.
|
|
|
Grafton Bridge 2 widening works on SH1 looking southbound.
|
|
|
Enclosed lane on the Southern Motorway northbound, at the Khyber Pass Viaduct.
|
|
|
Widening of Grafton Bridge 3a on SH1 looking southbound.
|
|
|
Installation of steel edge beam for Grafton Bridge 3a.
|
|
|
Installation of steel edge beam for Grafton Bridge 3a.
|
|
|
The median area on the Khyber Pass Viaduct. The gap between the north and southbound carriageways
will soon be poured, joining the two structures together.
|
|
|
Underside of the Khyber Pass Viaduct showing the new strengthening beams that have been installed.
|
|
|
New motorway gantry.
|
|
|
Paving in the median area between Gillies Ave and Khyber Pass.
|
|
|
New Rangitoto patterned barriers installed on the motorway shoulder.
|
|
|
A slipform machine being used to pour a new barrier on the shoulder of Grafton Bridge 2.
|
|
|
Steel reinforcing for the barrier on the shoulder of Grafton Bridge 2.
|
|
|
Installation of a storm water treatment device on the shoulder of the motorway.
|
|
|
Stormwater treatment devices under construction at the project office yard.
|
|