arrow CMJ - STAGE 2 Photos

The photographs below illustrate the progress on CMJ Stage 2 to date. Click on the images for a larger view.

Aerial photograph, looking east, showing the Northwestern Motorway in the foreground, with the existing links to the Southern Motorway and Port and from the City in the background before construction started in February 2004. North Western Motorway
K Road looking north with the Northern Motorway in the background. Aerial view of the demolition work underway on Ramp B, February and March 2004. K Road
Demolition Photo showing demolition of part of Ramp B, demolished to make way for new connections from NW to North and Port to North. It shows what a difficult job it was with the tangle of reinforcing steel through the concrete structure. Ramp B Demolition
Demolition of Ramp B, which was built in the early 70's when traffic volumes and populations were less. The rest of the structure will be incorporated into the new Northwestern to North motorway-to-motorway link and the new port to north link. Ramp B Demolition
The relocated SH1 Nelson St Off Ramp (centre). Also the new Port and Northwestern connection to Northern Motorway. Artists Impression
The elevated structure (viaduct) across the picture is the new SH1 Nelson Street Off Ramp. Artists Impression
New connection from Northwestern to North (northbound). Artists Impression
Aerial from above Upper Queen Street Bridge looking north. August 2006. Aerial from above Upper Queen Street Bridge looking north
Looking west from Upper Queen Street, August 2006 left to right: Existing Port to Northwestern Motorway (SH16) link, new Port to Northern Motorway (SH16 to SH1) link, new Northern Motorway to Port (SH1 to SH16) link, existing Northwestern Motorway to Port link, existing Northwestern to Southern Motorway (SH16 to SH1) link, existing Southern Motorway (SH1) southbound. The elevated link is the Southern Motorway (SH1) northbound. New Motorway connections to open December 2006. Looking west from Upper Queen Street
Aerial photo looking east from above Newton Road Bridge.
Centre left: Earthworks for the new Northwestern Motorway to the Northern Motroway and the Nelson Street off-ramp which diverges from the left hand side of the Northwestern Motorway.
Centre: Earthworks for the Sedimentation Pond which will contain and treat stormwater run-off from the site before it is released into the Auckland City Council stormwater system. March 2005.
Aerial photo looking east from above Newton Road Bridge.
Aerial photo on Newton Gully: left side new Northwestern Motorway to Nelson Street off-ramp and Northwestern Motorway to Northern Motorway link connections under construction May 2005 Aerial photo on Newton Gully
Aerial view looking east from above Newton Road bridge, August 2006. Left to right: Northwestern Motorway (SH16) to Nelson Street (and in December 2006 Northwestern Motorway to the Northern Motorway (SH16 to SH1 link), Northwestern to Southern Motorway and to the Port, the new Sedimentation Pond, westbound links from the Port and the Southern Motorway and the Hobson Street on-ramp.

Aerial view looking east from above Newton Road bridge

Aerial photo looking south over the Pitt / Union / Nelson / Hobson St intersection.
Structure 1: New Southern Motorway northbound off-ramp to Nelson Street (centre) which will diverge from the left hand side of the motorway. Scheduled to open mid-2005. To the right of Structure No 1 is Structure No 2, which is part of the new Northwestern and Ports of Auckland to Northern Motorway-to-Motorway connections. Scheduled for completion late 2006.

Aerial photo looking south over the Pitt / Union / Nelson / Hobson St
			intersection

Aerial photo showing progress of the new Southern Motorway to Nelson Street off-ramp to the CBD. May 2005 Aerial photo showing progress of the new Southern Motorway to Nelson Street off-ramp to the CBD
Aerial photo showing construction progress of SH1 to Nelson Street off-ramp October 2005. Aerial photo above Union Street October 2005
Aerial photo showing new Southern Motorway to Nelson Street off-ramp - opened 12 December 2005 - to the CBD. Note: Below Structure 1, first beams placed for Structure 6 across SH southbound January 2006. Aerial Photo above Union St
Aerial Photo looking south along SH1 to Wellington Street Bridge.
Following clearance of the vegetation (centre) on the embankment beside SH1 southbound from the Cook Street off-ramp, construction of the northern extent of the new North to Port and North to Northwestern Motorway links began in February 2005. These new links will exit from the left of the Southern Motorway. The existing southbound carriageway is to be realigned and lowered between the Cook Street off-ramp and the Hobson Street on-ramp to allow the new links to pass over the Southern Motorway on a new bridge. Initial work will include shifting SH1 north and southbound carriageways onto temporary alignments between Cook Street off-ramp and Hopetoun Street bridge to allow a safe working space for construction of the new retaining walls and bridge. The new North to Port and Northwestern Motorway links are scheduled to open late 2006.

Aerial Photo looking south along SH1 to Wellington Street Bridge.

Aerial photo showing progress of the works near Wellington Street. May 2005. Aerial photo showing progress of the works near Wellington Street. May 2005.

Aerial photo showing progress of the works near Wellington Street. The piled retaining wall has been excavated to sub-grade level to form the northern most part of the new North to Port and North to Northwestern Motorway links.

Aerial photo showing progress of the works near Wellington Street.
Aerial view of Southern Motorway showing works on the Northern Tie-in on the southbound side just prior to switching the traffic from the temporary southbound alignment to the new lowered alignment through Structure No 6 bridge / tunnel. Aerial view of Southern Motorway showing works on the Northern Tie-in
Aerial looking west along SH16 over the Haslett Street footbridge. The Newton on-ramp to the Northwestern Motorway (SH16) is on the left and the Newton off-ramp from the Northwestern Motorway is on the right. The central median works under construction in this photo taken at the end of August 2006 will provide an extra lane as part of the improvements to traffic flows for eastbound, citybound and southbound traffic. Aerial looking west along SH16 over the Haslett Street footbridge.
Aerial looking east above Northwestern Motorway (SH16). Widening for the additional westbound lane nearing completion, August 2006. Aerial looking east above Northwestern Motorway (SH16)
Beresford Street viaduct: First two spans in preparation for decking July 2004. Beresford Street viaduct:
Beresford Street Viaduct: Decking complete. In the background the new Southern Motorway to Nelson Street off-ramp viaduct. May 2005 Beresford Street Viaduct: Decking complete
Structure No 1: New Southern Motorway to Nelson Street off-ramp showing the karaka and ta moko design on the safety barriers Structure No 1: New Southern Motorway to Nelson Street off-ramp
Structure No 1: View looking south from Union Street showing reinforcing steel in place ready for the final pour of deck concrete. June 2005. Structure No 1: View looking south from Union Street
Paving works on the new Northwestern Motorway off-ramp to Nelson Street and the Northern Motorway connection. The off-ramp to Nelson Street opened for traffic in early July 2005. The motorway to motorway connection connecting the Northwestern to the Northern Motorway will open late 2006. Paving works on the new Northwestern Motorway off-ramp to Nelson Street and the Northern Motorway 
			connection
The new alignment for the Northwestern Motorway to Nelson Street off-ramp goes under 'Ramp B' before merging with the northern end of the old off-ramp and terminating at Union Street. The new alignment for the Northwestern Motorway to Nelson Street off-ramp goes under 'Ramp B'
The new Northwestern Motorway to Nelson Street off-ramp in use July 2005. Earthworks below the retaining wall covered to prevent unnecessary runoff. The new Northwestern Motorway to Nelson Street off-ramp in use July 2005.
Structure No 4: Looking south from beneath the two northern spans to the two southern spans. Piling for the central pier will commence after the Hobson on-ramp to the Northwestern Motorway is realigned. Structure No 4: Looking south from beneath the two northern spans to the two southern spans.
Structure No 4: Preparation for decking of the two southern spans. Structure No 4: Preparation for decking of the two southern spans.
Retaining Wall 5A: Installation of decorative panels the Pohutukawa flower design Retaining Wall 5A: Installation of decorative panels the Pohutukawa flower design
Retaining Wall 5A: Installation of decorative panels the Pohutukawa flower design Retaining Wall 5A: Installation of decorative panels the Pohutukawa flower design
Retaining Wall 4A: Above Wall 4A will be the new Northwestern to Northern Motorway to Motorway connection. In the foreground is the Northwestern Motorway to Nelson Street off-ramp curving round to go under 'Ramp B'. Retaining Wall 4A
The new Northern Motorway to Port link: Looking south over Structure 5, a new one span bridge which crosses the Northwestern to Southern Motorway and the Northwestern to Port links. On the right are the two southern spans of the six span Structure 4 which will take traffic from the Port to the Northern Motorway. On the left the existing Newton No 1 bridge which carries the Southern Motorway northbound. The new Northern Motorway to Port link
The completion of retaining Wall 2G showing the extra lane width gained to improve the alignment and visible stopping distances for the Port to Northwestern link. The completion of retaining Wall 2G
Karaka leaves and berries design Karaka leaves and berries design
Ta moko design Ta moko design

600 metres of retaining walls are under construction in the area of SH1 southbound between Cook Street off-ramp and Hobson Street on-ramp. Four of these retaining walls and the two walls for the 200m long cross-over bridge are required to enable the excavation of the Southern Motorway southbound. Four more retaining walls are required in the embankment beside Union Street, to provide the new exit lane.

SH1 southbound traffic will be shifted onto a temporary alignment to be constructed behind the new walls, later this year, while the existing southbound carriageway is excavated and a new carriageway constructed 4m lower than at present. The lowered carriageway will provide headroom for the cross-over bridge which will carry traffic to the Port and the Northwestern links.

As well as the retaining walls being constructed, three existing structures (Wellington Street Bridge, SH1 to Nelson Street off-ramp and Hobson street on-ramp to the Northwestern Motorway) need to be underpinned to allow the Southern Motorway southbound to be reduced in level directly adjacent to the existing foundations.

Southern Motorway southbound, Structure 6 west wall piles June 2004. This is one of two walls to be constructed as part of the cross-over bridge which will carry traffic from the North Shore eastbound to Grafton Gully and the Port and westbound to the Northwestern Motorway Southern Motorway southbound, Structure 6 west wall piles June 2004
Southern Motorway, southbound Structure 6 west wall piers July 2005. A temporary SH1 southbound lane will be constructed to the left of this wall and traffic switched on to it later this year. The carriageway to the right will then be excavated, lowered and reconstructed. Southern Motorway, southbound Structure 6 west wall piers July 2005