CMI Logo
Transit Website

 

 
 
Home
Search
Site Map
Feedback
Register
CMI
Grafton Gully
CMJ
Vic Park Tunnel
 
 
       
 
 
image VICTORIA PARK TUNNEL - ENGINEERING




Road Standards and Design Features

  • Improved standard of median and edge barriers.
  • Ability to dynamically manage the motorway considering traffic and bus priority requirements.
  • Better connections with the central motorway improvements.
  • Make best use of the unused traffic capacity of the Auckland Harbour Bridge by increasing the capacity of its approaches.

Geotechnical

  • Most of this section of the motorway is built on reclaimed land.
  • Geotechnical testing has taken place to consider groundwater flows and soil contamination.

Existing Services

  • The Tunnel impacts on sewerage and stormwater pipelines and telecommunications cables.
  • These services will be relocated as part of the project.

Constructability

  • The Tunnel will be constructed while minimising disruption to traffic.

Proposed Viewpoint Proposed