CMI Logo
Transit Website

 

 
 
Home
Search
Site Map
Feedback
Register
CMI
Grafton Gully
CMJ
Vic Park Tunnel
 
 
       
 
 
image VIC PARK TUNNEL - RESOURCE CONSENT DOCUMENTS




Volume / Section Download
Overview
Executive Summary PDF (73KB)
Map (A3) PDF (268KB)
Volume 1: Resource Consent Applications and Assessment of Environmental Effects
ARC - Assessment of Environmental Effects PDF (410KB)
Resource Consent 1 - Groundwater PDF (4.9MB)
Resource Consent 2 - Discharge of Contaminants (passive) PDF (784KB)
Resource Consent 3 - Discharge of Contaminants (recharging) PDF (765KB)
Resource Consent 4 - Sediment Control Application PDF (595KB)
Resource Consent 5 - Stormwater PDF (6.1MB)
Resource Consent 6 - Coastal Permit PDF (2.2MB)
Volume 2: Appendices
Appendix A: Preliminary Geotechnical Appraisal Report PDF (5.9MB)
Appendix B: Hydrogeological and Engineering Assessment
Appendix B: Hydrogeological Report PDF (649KB)
Appendix B: Hydrogeological Figures 1 of 5 PDF (31.1MB)
Appendix B: Hydrogeological Figures 2 of 5 PDF (551KB)
Appendix B: Hydrogeological Figures 3 of 5 PDF (629KB)
Appendix B: Hydrogeological Figures 4 of 5 PDF (629KB)
Appendix B: Hydrogeological Figures 5 of 5 PDF (526KB)
Appendix B: Hydrogeological Appendix A PDF (7.7MB)
Appendix B: Hydrogeological Appendix B PDF (60KB)
Appendix B: Hydrogeological Appendix C PDF (4.2MB)
Appendix B: Hydrogeological Appendix D and E PDF (1.1MB)
Appendix B: Hydrogeological Appendix F PDF (26.8MB)
Appendix B1 - Addendum to Hydrogeological and Engineering Assessment PDF (22.4MB)
Appendix C: Preliminary Environmental Assessment
Appendix C - Part 1: Technical Report - Preliminary Environmental Assessment PDF (188KB)
Appendix C - Part 1: Technical Report - Preliminary Environmental Assessment (Addendum) PDF (5.0MB)
Appendix C - Part 2: Appendix A - Adjacent Property Details PDF (2.1MB)
Appendix C - Part 2: Appendix B to G - ARC Correspondence and Information PDF (1.5MB)
Appendix C - Part 2: Appendix Ha - ARC Borelog Database Information PDF (17.9MB)
Appendix C - Part 2: Appendix Hb - ARC Borelog Database Information PDF (2.3MB)
Appendix C - Part 2: Appendix Hc - ARC Borelog Database Information PDF (5.9MB)
Appendix C - Part 2: Appendix Hd - ARC Borelog Database Information PDF (7.4MB)
Appendix C - Part 2: Appendix He - ARC Borelog Database Information PDF (9.2MB)
Appendix C - Part 2: Appendix Hf - ARC Borelog Database Information PDF (3.7MB)
Appendix C - Part 2: Appendix Hg - ARC Borelog Database Information PDF (4.4MB)
Appendix C - Part 2: Appendix Hh - ARC Borelog Database Information PDF (7.5MB)
Appendix C - Part 2: Appendix I - ACC Hazard Maps PDF (7.0MB)
Appendix C - Part 2: Appendix J - ACC Site Information PDF (2.4MB)
Appendix C - Part 2: Appendix K to L - ACC Aerial Photographs and Auckland Public Library Photographic Records PDF (5.6MB)
Appendix C1: Addendum to Preliminary Environmental Assessment PDF (971KB)
Appendix D: Initial Environmental Investigation
Appendix D1: HBTC Technical Report No. 5 Initial Environmental Investigation, Volume 1 PDF (10.6MB)
Appendix D2: HBTC Technical Report No. 5 Initial Environmental Investigation, Volume 2 PDF (12.6MB)
Appendix E: Assessment of Land Disturbing Activities PDF (1.3MB)
Appendix F: Assessment of Contamination 1 of 2 PDF (8.7MB)
Appendix F: Assessment of Contamination 2 of 2 PDF (58.3MB)
Appendix F: Assessment of Contamination Aerial 1 PDF (4.1MB)
Appendix F: Assessment of Contamination Aerial 2 PDF (4.0MB)
Appendix F: Assessment of Contamination Aerial 3 PDF (4.0MB)
Appendix F: Assessment of Contamination Aerial 4 PDF (7.7MB)
Appendix F: Assessment of Contamination Aerial 5 PDF (3.8MB)
Appendix F: Assessment of Contamination Aerial Approximate Location of Project Route PDF (158KB)
Appendix G: Stormwater Preliminary Design Report 1 of 2 PDF (1.8MB)
Appendix G: Stormwater Preliminary Design Report 2 of 2 PDF (951KB)
Appendix H: Environmental Management Plan PDF (313KB)
Appendix I: Environmental Monitoring Guidelines PDF (285KB)
Volume 3: Plans
Plan 0457C100: Scheme Overview and Drawing Schedule PDF (14.0MB)
Plan 0457C101: Aerial view - Shelly Beach PDF (21.9MB)
Plan 0457C102: Aerial view - St Mary’s Bay PDF (27.6MB)
Plan 0457C103: Aerial View - Victoria Park PDF (21.8MB)
Plan 0457C104: Aerial View - Wellington Street PDF (151KB)
Plan 0457C201: Corridor Improvements - Shelly Beach PDF (167KB)
Plan 0457C202: Corridor Improvements - St Mary’s Bay PDF (210KB)
Plan 0457C203: Corridor Improvements - Victoria Park PDF (110KB)
Plan 0457C204: Corridor Improvements - Wellington Street PDF (211KB)
Plan 0457C221: Longitudal Section - Northbound Carrigeway PDF (212KB)
Plan 0457C222: Longitudal Section - Tunnel Section PDF (179KB)
Plan 0457C223: Longitudal Section - Southbound Carrigeway PDF (180KB)
Plan 0457C231: Typical Cross Section - St Mary’s Bay PDF (111KB)
Plan 0457C232: Typical Cross Section - Tunnel Approaches PDF (128KB)
Plan 0457C233: Typical Cross Section - Tunnel PDF (126KB)
Plan 0457C235: Detail Cross Section - Sheet 1 PDF (110KB)
Plan 0457C236: Detail Cross Section - Sheet 2 PDF (108KB)
Plan 0457C237: Detail Cross Section - Sheet 3 PDF (110KB)
Plan 0457C238: Detail Cross Section - Sheet 4 PDF (92KB)
Plan 0457C501: Construction Sequence - St Mary’s Bay PDF (129KB)
Plan 0457C502: Tunnel Construction Sequence - Stage 1 PDF (155KB)
Plan 0457C503: Tunnel Construction Sequence - Stage 2 PDF (158KB)
Plan 0457C504: Tunnel Construction Sequence - Stage 3 PDF (216KB)
Plan 0457C505: Tunnel Construction Sequence - Victoria Park PDF (28.0MB)
Plan 0457C601: Stormwater Management - Shelly Beach PDF (195KB)
Plan 0457C602: Stormwater Management - St Mary’s Bay PDF (198KB)
Plan 0457C603: Stormwater Management - Victoria Park PDF (216KB)
Plan 0457C604: Stormwater Management - Wellington Street PDF (113KB)
Plan 0457C605: Stormwater Management - Stormwater and Sewer Diversions PDF (134KB)
Plan 0457C901: Shelly Beach Flyover Pier Relocation PDF (133KB)
Section 92 - Further Information
ARC Section 92 Response Report PDF (1.7MB)
ARC Section 92 Response Report 2 PDF (1.7MB)
ARC Section 92 Response Report 3 PDF (353KB)
ARC Section 92 Response Report 4 PDF (85KB)